Project Overview
This completed miners’ camp project stands as one of Zao Caststone Solutions’ most comprehensive turnkey deliveries — a full-scale residential camp built from the ground up for a mining client. Zao Caststone handled the entire scope of works, from construction through to finishes, fittings, and utility connections, delivering a fully operational camp ready for immediate occupation.
The camp comprises 20 single-room units across 5 blocks, supported by a full suite of amenity buildings — an office block, kitchen, dining house, bar, gym, servants’ quarters, and a secure perimeter wall. Every unit was finished and fitted with air conditioning and fans, and Zao Caststone coordinated the electricity supply from KPLC directly to the camp.
Status: Completed
The Camp at a Glance
| Feature | Detail |
|---|---|
| Project Type | Miners’ Residential Camp |
| Accommodation | 20 Single-Room Units |
| Blocks | 5 Blocks |
| Block Configuration | 2 Blocks housing 14 units; 3 Blocks housing 6 units |
| Amenity Buildings | Office Block, Kitchen, Dining House, Bar, Gym, Servants’ Quarters |
| Perimeter | Full Perimeter Wall |
| Fittings | Air Conditioning & Fans Installed |
| Utilities | KPLC Electricity Supply Delivered |
| Scope | Full Turnkey — Construction to Finishes |
| Status | Completed |
Accommodation Blocks
The camp’s residential accommodation is arranged across 5 blocks totalling 20 single-room units, planned for efficient occupancy and ease of management:
- 2 Blocks — housing 14 units between them, forming the primary accommodation wing
- 3 Blocks — housing the remaining 6 units, completing the camp’s residential capacity
Each single-room unit was fully finished to a comfortable standard suitable for long-stay occupancy, with air conditioning and fans installed throughout to ensure comfort in all seasons.
Amenity & Support Buildings
What sets this camp apart is the completeness of its supporting infrastructure — everything needed to run a functioning residential camp was built and finished:
Office Block
A dedicated administration building for camp management, operations, and client oversight.
Kitchen
A fully built and fitted commercial-style kitchen to serve the camp’s residents at scale.
Dining House
A communal dining facility providing seated meals for camp occupants.
Bar
A recreational bar area for residents’ leisure and social downtime after shifts.
Gym
An on-site fitness facility supporting residents’ health and wellbeing — a valuable amenity for a remote mining workforce.
Servants’ Quarters
Dedicated staff accommodation to support camp operations and housekeeping.
Perimeter Wall
A full perimeter wall enclosing the entire camp, providing security, controlled access, and privacy — essential for a mining site environment.
Finishes & Fittings
Zao Caststone delivered the project through to full finishes, meaning the client received a camp that was ready to occupy — not a shell. Works included:
- Complete finishing across all residential units and amenity buildings
- Air conditioning and fans installed in the units
- Quality fittings throughout, consistent with Zao Caststone’s finishing standards
- Full construction from foundation through to final handover
Utilities — KPLC Electricity Supply
Zao Caststone coordinated and supplied electricity to the camp via KPLC, connecting the entire site to the national grid. This ensured the camp had a reliable, metered power supply to support the AC units, fans, kitchen, gym, and all amenity buildings — a critical element for a functioning residential camp.
Scope Delivered — Full Turnkey
This project demonstrates Zao Caststone Solutions’ capacity to deliver end-to-end camp construction:
| Scope Area | Delivered |
|---|---|
| Civil & Structural Construction | ✅ |
| Residential Blocks (5) & 20 Units | ✅ |
| Office, Kitchen, Dining, Bar, Gym, Servants’ Quarters | ✅ |
| Perimeter Wall | ✅ |
| Full Finishes | ✅ |
| ACs & Fans Installation | ✅ |
| KPLC Electricity Connection | ✅ |
Project Status
Status: Completed
The camp was delivered fully finished and operational, with all buildings, fittings, and utility connections in place.
For project enquiries or references:
📞 0725710895
📧 admin@zaoconstruction.com
📍 Zao Caststone Solutions, Eldoret
Miners’ Camp Project — delivered turnkey, from foundation to finishes.